Saturday, 19 December 2009

retaining wall


Here i took down the lower wall so as to widen
the drive and build a higher retaining wall.
The cut out for the bins was done at a later date
when i built the front wall.....see the stone wall below

stone panels in brickwork





This job went through a few changes
before we got to the final wall.
The caps were brought by the owner.railings were surplied and fitted by DSL




Wednesday, 13 August 2008

cloak room

small side extention which was rendered and will be painted by anna,....well at least phill hopes so....!

Tuesday, 29 April 2008

stone work + paving







This was a take down and rebuild of the stone work, no time weekends to be cutting grass,
well lets turn it into patio.......! the drive was looking a bit past its sell by date to....! The job its self was very tight for space while i was doing it, but all done now.....
also met some really nice people while i was doing this job.....




Friday, 15 February 2008

large pond with bridge








The liner for this pond weighed in at 1/4 of a ton, concrete was laid around the bank to take brickwork, footings are put in to take piers for bridge, brackets were made to take timber, these were especially for this bridge, the decking was made up of 6x2 joist as the clients are going to put a summer house on it at a later date. now its ready for the planting up, turf will go right up to the edge,......will get more pics when this is done,
new pics 3 years on






Tuesday, 5 February 2008

moongate



The moongate wall, interesting project completed.


This decorative garden wall was built with the accomodation of the dustbin included.